Work - Management System -wms- Adnoc Pdf

- Planned work percentage (Target: >85%) - Schedule compliance (Target: >90%) - Backlog trend (weeks of work) - PTW turnaround time - Rework percentage

The ADNOC Work Management System (WMS) provides a standardized framework for the safe, efficient, and reliable execution of all maintenance and operational work across ADNOC Group’s assets. It integrates with the ADNOC Operational Excellence (OE) System and enforces rigorous Permit to Work (PTW) protocols to ensure zero harm, maximum asset integrity, and optimized lifecycle cost. work management system -wms- adnoc pdf

6.1 Use of Maximo / SAP PM (typical ADNOC CMMS) 6.2 Mobile Workforce Management (Tablet-based job packs) 6.3 Dashboard & Analytics (Power BI / ADNOC Panorama) 6.4 Future: AI for predictive work scheduling - Planned work percentage (Target: >85%) - Schedule

- Permit to Work (PTW) process (cold, hot, confined space) - Isolation management (LOTO – Lock Out Tag Out) - Real-time progress tracking - Planned work percentage (Target: &gt

| Priority | Definition | Planning Window | Execution Window | |----------|------------|----------------|------------------| | P0 (Emergency) | Imminent HSE or major production loss | 0 hr | Immediate | | P1 (Urgent) | Significant degradation | 4-8 hrs | 24 hrs | | P2 (Planned) | Routine corrective/preventive | 2 weeks | 4 weeks | | P3 (Deferrable) | Minor improvement / low risk | Next shutdown | Next opportunity |