Gasturb 13 -
A 14-stage axial design, but with a trick: the first four rows of blades were made from a titanium-aluminide alloy that United Turbine had licensed from a bankrupt Swiss metallurgy firm. This allowed the compressor to swallow dirty air (paper mills are full of fibrous dust) without eroding the blades for at least 35,000 hours. The distinctive whine of a Gasturb 13 at start-up—a rising, almost mournful howl that peaked at 7,100 rpm—was known as the “Vinter Scream,” after its creator.
Officially designated the by its manufacturer, the long-defunct Anglo-Swedish consortium United Turbine AB , the moniker “Gasturb 13” stuck. It was a reference not to a model number, but to the thirteenth major design iteration of a core compressor architecture that first spooled up in 1982. To engineers, it was a paradox: a machine with the thermodynamic efficiency of a much larger turbine but the footprint of a regional power plant workhorse. To plant operators, it was a stubborn, loyal, and occasionally terrifying metallic dragon that demanded respect. To the energy industry, Gasturb 13 was the machine that bridged the gap between the brute-force industrial turbines of the 1970s and the digitally-optimized hybrids of the 2000s. The Genesis of a Compromise The story of Gasturb 13 begins not with a clean sheet of paper, but with a failure. In 1978, United Turbine AB had bet its future on the Gasturb 10 , a massive, 150-megawatt single-shaft machine designed for base-load coal-gasification plants. The oil crises of the decade had made coal seem like the future, but the Gasturb 10 was a nightmare: it was prone to first-stage blade creep, its annular combustor suffered from harmonic instability, and its control system—a labyrinth of analog relays and hydraulic actuators—was obsolete before it left the factory. Only seven units were ever sold. Gasturb 13
In the sprawling pantheon of industrial machinery, certain names carry the weight of legend: the Rolls-Royce Merlin, the General Electric 7HA, the Siemens SGT-800. Yet, for every celebrated behemoth, there exists a quieter, more disruptive predecessor—a machine that solved a problem no one had yet admitted existed. For the combined heat and power (CHP) markets of the late 1990s, that machine was Gasturb 13 . A 14-stage axial design, but with a trick:
But not all. In 2019, a peculiar thing happened. As renewable penetration soared in Europe, grid operators discovered that modern, high-efficiency combined-cycle plants were too slow . They needed machines that could go from spark to full load in under 12 minutes—the Gasturb 13’s specialty. A small industry of “Gasturb 13 revivalists” emerged, centered around a former United Turbine field engineer named Klaus Dettweiler, who had secretly stockpiled 40,000 critical parts in a warehouse in Szczecin, Poland. To plant operators, it was a stubborn, loyal,
Unlike the can-annular or silo designs of competitors, Gasturb 13 used a single annular reverse-flow combustor . Fuel (natural gas or #2 diesel) was injected through 24 nozzles arranged in a ring, with the flame front traveling backward relative to the compressor discharge. This allowed for a longer residence time at lower peak temperatures, drastically cutting NOx emissions to 15 ppm—a miracle for the early 1990s without selective catalytic reduction. The downside: the reverse-flow design created a resonant frequency at 75% load that could shake the entire building. Operators learned to “punch through” that band quickly, accelerating from 74% to 76% in under two seconds, lest the windows shatter.